{"id":841104,"date":"2022-12-08T06:04:46","date_gmt":"2022-12-08T05:04:46","guid":{"rendered":"https:\/\/bebeez.it\/non-categorizzato\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/"},"modified":"2022-12-08T06:04:46","modified_gmt":"2022-12-08T05:04:46","slug":"granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project","status":"publish","type":"post","link":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/","title":{"rendered":"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project"},"content":{"rendered":"<p>WATSONVILLE, Calif.&#8211;(BUSINESS WIRE)&#8211;<a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Fwww.graniteconstruction.com%2F&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=Granite&amp;index=1&amp;md5=463e2be2d8a2a6b100511eb8fd5951fd\" rel=\"noopener\">Granite<\/a> (NYSE:GVA) announced today that it has been awarded an approximately $14 million traffic flow improvement project in Santa Barbara, CA by the California Department of Transportation (Caltrans). This is a \u2018parallel project\u2019 to the Highway 101: Carpinteria to Santa Barbara suite of projects, which Granite is delivering using the innovative, collaborative <a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Fwww.graniteconstruction.com%2Four-work%2Fcmgc-process&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=Construction+Manager+General+Contractor&amp;index=2&amp;md5=75760df2484dd7abd73b2e5ef0887f09\" rel=\"noopener\">Construction Manager General Contractor<\/a> (CMGC) project delivery method. The project will be funded by the Regional Surface Transportation Program, and is expected to be included in Granite\u2019s fourth quarter CAP.\n<\/p>\n<p><a href=\"https:\/\/mms.businesswire.com\/media\/20221206006037\/en\/662198\/5\/Granite-Logo-Color.jpg\"><\/a><\/p>\n<p>\nThe project will construct two roundabouts in the heart of Montecito\u2019s lower village. Located where busy frontage and arterial roads intersect with freeway ramps, the roundabouts will improve the traffic flow for residents and businesses. Granite\u2019s Gardner Facility will supply approximately 2,500 tons of hot mix asphalt (HMA), and all pavement and hardscape removed from the project will be recycled for use on Granite\u2019s CMGC corridor projects.\n<\/p>\n<p>\n\u201cThese intersections are the gateway to Montecito and on the route to two nearby schools, so the improved traffic flow will be a real improvement for folks,\u201d said Granite VP Regional Operations, Larry Camilleri. \u201cThis project fulfills commitments made to the City of Santa Barbara and Santa Barbara County to improve mobility not only on the freeway, but on local roads throughout the Highway 101 corridor.\u201d\n<\/p>\n<p>\nThe project is underway and is expected to be completed in December 2023.\n<\/p>\n<p>\nAbout Granite\n<\/p>\n<p>\nCelebrating its centennial year, Granite is America\u2019s Infrastructure Company\u2122. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite\u2019s Code of Conduct and strong Core Values guide the company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit <a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=http%3A%2F%2Fwww.graniteconstruction.com&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=graniteconstruction.com&amp;index=3&amp;md5=f9c878c363c497671059c7e14b941815\" rel=\"noopener\">graniteconstruction.com<\/a>, and connect with Granite on <a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fgranite-construction&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=LinkedIn&amp;index=4&amp;md5=437d81ca8ea8cfdb08678c20bcd1ed9a\" rel=\"noopener\">LinkedIn<\/a>, <a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Ftwitter.com%2Fgranite&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=Twitter&amp;index=5&amp;md5=5a9e24f891df26271c1a608bd53ee3a2\" rel=\"noopener\">Twitter<\/a>, <a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Fwww.facebook.com%2Fgraniteconstruction&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=Facebook&amp;index=6&amp;md5=27b075c685ed5503c7bad0280e47023d\" rel=\"noopener\">Facebook<\/a>, and <a target=\"_blank\" href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Fwww.instagram.com%2Fgraniteconstruction%2F&amp;esheet=53014063&amp;newsitemid=20221206006037&amp;lan=en-US&amp;anchor=Instagram&amp;index=7&amp;md5=db08fab41b7eb6634c33414cb1fcd4eb\" rel=\"noopener\">Instagram<\/a>.\n<\/p>\n<p>Contacts <\/p>\n<p>\nMedia<br \/>\n<br \/>Erin Kuhlman 831-768-4111\n<\/p>\n<p>\nInvestors<br \/>\n<br \/>Wenjun Xu &#8211; 831-761-7861<\/p>","protected":false},"excerpt":{"rendered":"<p>WATSONVILLE, Calif.&#8211;(BUSINESS WIRE)&#8211;Granite (NYSE:GVA) announced today that it has been awarded an approximately $14 million traffic flow improvement project in Santa Barbara, CA by the California Department of Transportation (Caltrans). This is a \u2018parallel project\u2019 to the Highway 101: Carpinteria to Santa Barbara suite of projects, which Granite is delivering using the innovative, collaborative Construction [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49630],"tags":[],"settori":[],"slider_categorie_and_home_page":[],"class_list":["post-841104","post","type-post","status-publish","format-standard","hentry","category-real-estate-in-asia-pacific"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project - BeBeez<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project - BeBeez\" \/>\n<meta property=\"og:description\" content=\"WATSONVILLE, Calif.&#8211;(BUSINESS WIRE)&#8211;Granite (NYSE:GVA) announced today that it has been awarded an approximately $14 million traffic flow improvement project in Santa Barbara, CA by the California Department of Transportation (Caltrans). This is a \u2018parallel project\u2019 to the Highway 101: Carpinteria to Santa Barbara suite of projects, which Granite is delivering using the innovative, collaborative Construction [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\" \/>\n<meta property=\"og:site_name\" content=\"BeBeez\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-08T05:04:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bebeez.it\/wp-content\/uploads\/2019\/10\/be-beez-logo-x2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"683\" \/>\n\t<meta property=\"og:image:height\" content=\"242\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project\",\"datePublished\":\"2022-12-08T05:04:46+00:00\",\"dateModified\":\"2022-12-08T05:04:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\"},\"wordCount\":346,\"publisher\":{\"@id\":\"https:\/\/15.161.165.86\/#organization\"},\"articleSection\":[\"Real Estate in Asia Pacific\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\",\"url\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\",\"name\":\"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project - BeBeez\",\"isPartOf\":{\"@id\":\"https:\/\/15.161.165.86\/#website\"},\"datePublished\":\"2022-12-08T05:04:46+00:00\",\"dateModified\":\"2022-12-08T05:04:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/bebeez.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/15.161.165.86\/#website\",\"url\":\"https:\/\/15.161.165.86\/\",\"name\":\"BeBeez\",\"description\":\"BeBeez\",\"publisher\":{\"@id\":\"https:\/\/15.161.165.86\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/15.161.165.86\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/15.161.165.86\/#organization\",\"name\":\"BeBeez\",\"url\":\"https:\/\/15.161.165.86\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/15.161.165.86\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bebeez.it\/wp-content\/uploads\/2019\/10\/be-beez-logo.png\",\"contentUrl\":\"https:\/\/bebeez.it\/wp-content\/uploads\/2019\/10\/be-beez-logo.png\",\"width\":309,\"height\":122,\"caption\":\"BeBeez\"},\"image\":{\"@id\":\"https:\/\/15.161.165.86\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project - BeBeez","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/","og_locale":"en_US","og_type":"article","og_title":"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project - BeBeez","og_description":"WATSONVILLE, Calif.&#8211;(BUSINESS WIRE)&#8211;Granite (NYSE:GVA) announced today that it has been awarded an approximately $14 million traffic flow improvement project in Santa Barbara, CA by the California Department of Transportation (Caltrans). This is a \u2018parallel project\u2019 to the Highway 101: Carpinteria to Santa Barbara suite of projects, which Granite is delivering using the innovative, collaborative Construction [&hellip;]","og_url":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/","og_site_name":"BeBeez","article_published_time":"2022-12-08T05:04:46+00:00","og_image":[{"width":683,"height":242,"url":"https:\/\/bebeez.it\/wp-content\/uploads\/2019\/10\/be-beez-logo-x2.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/#article","isPartOf":{"@id":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/"},"author":{"name":"","@id":""},"headline":"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project","datePublished":"2022-12-08T05:04:46+00:00","dateModified":"2022-12-08T05:04:46+00:00","mainEntityOfPage":{"@id":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/"},"wordCount":346,"publisher":{"@id":"https:\/\/15.161.165.86\/#organization"},"articleSection":["Real Estate in Asia Pacific"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/","url":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/","name":"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project - BeBeez","isPartOf":{"@id":"https:\/\/15.161.165.86\/#website"},"datePublished":"2022-12-08T05:04:46+00:00","dateModified":"2022-12-08T05:04:46+00:00","breadcrumb":{"@id":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bebeez.it\/en\/real-estate-in-asia-pacific\/granite-secures-approximately-14-million-cmgc-traffic-flow-improvement-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bebeez.it\/en\/"},{"@type":"ListItem","position":2,"name":"Granite Secures Approximately $14 million CMGC Traffic Flow Improvement Project"}]},{"@type":"WebSite","@id":"https:\/\/15.161.165.86\/#website","url":"https:\/\/15.161.165.86\/","name":"BeBeez","description":"BeBeez","publisher":{"@id":"https:\/\/15.161.165.86\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/15.161.165.86\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/15.161.165.86\/#organization","name":"BeBeez","url":"https:\/\/15.161.165.86\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/15.161.165.86\/#\/schema\/logo\/image\/","url":"https:\/\/bebeez.it\/wp-content\/uploads\/2019\/10\/be-beez-logo.png","contentUrl":"https:\/\/bebeez.it\/wp-content\/uploads\/2019\/10\/be-beez-logo.png","width":309,"height":122,"caption":"BeBeez"},"image":{"@id":"https:\/\/15.161.165.86\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/posts\/841104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/comments?post=841104"}],"version-history":[{"count":0,"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/posts\/841104\/revisions"}],"wp:attachment":[{"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/media?parent=841104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/categories?post=841104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/tags?post=841104"},{"taxonomy":"settori","embeddable":true,"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/settori?post=841104"},{"taxonomy":"slider_categorie_and_home_page","embeddable":true,"href":"https:\/\/bebeez.it\/en\/wp-json\/wp\/v2\/slider_categorie_and_home_page?post=841104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}